| Manufacturing Phase | Primary Operational Task | Governing Standard / Inspection Method |
| Design & Engineering | Calculating shell thickness, MAWP, and nozzle placement | ASME Section VIII, Div. 1 / FEA Analysis |
| Plate Cutting & Forming | Plasma cutting, edge beveling, and cylindrical shell rolling | Dimensional verification against shop drawings |
| Welding & Assembly | Joining shell sections, heads, and nozzles via certified welding | ASME Section IX / Visual Inspection & NDE |
| Hydrostatic Testing | Filling vessel with water and pressurizing to 1.3x design limits | Hydro-test monitoring for zero structural deformation or leaks |