| MOQ: | 1 ensembles |
| Prix: | 10000 USD |
| Délai De Livraison: | 2 mois |
| Méthode De Paiement: | LC, T/T |
| Capacité D'approvisionnement: | 200 ensembles/jours |
| Parameter | PFR (Plug Flow Reactor) | CSTR (Continuous Stirred Tank Reactor) |
|---|---|---|
| Conversion Efficiency | Higher conversion rates per unit volume | Lower conversion rates due to instant dilution |
| Reaction Rate | Highest at inlet, maintains gradient | Uniform throughout, occurs at lowest rate |
| Thermal Management | Sophisticated shell and tube configurations | Easy heat removal through uniform mixing |
| Spatial Efficiency | More compact systems for same output | Larger tank-based systems required |