| MOQ: | 1 Sets |
| Price: | 10000 USD |
| Delivery Period: | 2 months |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 200 sets / days |
| Operational Hazard | Primary Risk Factor | Recommended Safety Control | Target Equipment Component |
| Vapor Ignition | Flammable ethanol accumulation | Explosion-proof electrical wiring & exhaust ventilation | Entire distillation room / facility |
| Over-Pressurization | Closed valves or boiling spikes | Calibrated PRVs and rupture discs | Still boilers and rectification columns |
| Thermal Runaway | Uncontrolled heating element output | Automated temperature shutoffs and steam regulation | Steam jackets / heating elements |
| Material Degradation | Chemical corrosion or seal failure | Routine structural inspections and food-grade alloy use | Gaskets, flanges, and piping welds |